← Back to Kent

Solar · United Kingdom

Lockmeadow Centre, Barker Road - Solar Panels

Operator Maidstone Borough Council

Application Withdrawn0.4 MWData checked 16 November 2026Source record dated 10 November 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lockmeadow Centre, Barker Road - Solar Panels is a 0.4 MW solar farm in Maidstone, Kent, United Kingdom. Its planning application (25/502531/PN14J) went to Maidstone on 23 June 2025 and was withdrawn on 20 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 27 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

489 energy sites within 40 km for Lockmeadow Centre, Barker Road - Solar Panels

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Maidstone Borough Council
Location
Lockmeadow Centre, Barker Road, Maidstone, Kent, ME16 8SF, United Kingdom
Planning authority
Maidstone
Planning application
25/502531/PN14J

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/502531/PN14J, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 23 June 2025 Planning application submitted
  • 20 October 2025 Application withdrawn

None found. The register holds no published incident that names Lockmeadow Centre, Barker Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lockmeadow Centre, Barker Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lockmeadow Centre, Barker Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lockmeadow Centre, Barker Road - Solar Panels?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2025.
Where is Lockmeadow Centre, Barker Road - Solar Panels?
In Maidstone, Kent, United Kingdom (postcode ME16 8SF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).