Solar · Brazil
LIVE
Owner LIVE ROUPAS ESPORTIVAS LTDA.
Operational1.5 MWData checked 10 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
LIVE is a 1.5 MW solar farm 3.5 km west of Guaramirim, Jaraguá do Sul, Santa Catarina, Brazil. It first operated in 2023. Its status in the SIGA generation register (ANEEL, Brazil) is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 17 incidents at solar farms in Brazil, and 461 worldwide.
Get an email when LIVE changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in Brazil. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.5 MW
- Capacity figure from
- SIGA generation register (ANEEL, Brazil)
- Status
- Operational (Operação)
- Owner
- LIVE ROUPAS ESPORTIVAS LTDA.
- Location
- Jaraguá do Sul, Santa Catarina, Brazil
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 21 July 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names LIVE. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has LIVE had a fire or other incident?
- None is on the register as of 12 November 2026. The register holds no published incident that names LIVE; it holds 17 incidents at solar farms in Brazil.
- What is the status of LIVE?
- Operational, in the SIGA generation register (ANEEL, Brazil).
- Where is LIVE?
- 3.5 km west of Guaramirim, Jaraguá do Sul, Santa Catarina, Brazil.
Source: ANEEL, Sistema de Informacoes de Geracao (SIGA), Open Data Commons Open Database Licence (ODbL), dadosabertos.aneel.gov.br. The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).