Battery storage · United Kingdom
Littleton Solar Farm
Operator Stark Energy & SSE Renewables
OperationalData checked 16 November 2026Source record dated 8 April 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Littleton Solar Farm is a battery storage site 6 km south of Bidford-on-Avon, Worcestershire, United Kingdom. Its planning application (20/01798/FUL) went to Wychavon on 9 September 2020 and was granted on 6 January 2021. It has been operating since 27 March 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Littleton Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Status
- Operational
- Operator or applicant
- Stark Energy & SSE Renewables
- Location
- S/O Blakes Hill, Access Off Buckle Street, Honeybourne, Worcestershire, WR11 8YF, United Kingdom
- Planning authority
- Wychavon
- Planning application
- 20/01798/FUL
- First operating
- 2026
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/01798/FUL, with what the planning evidence pack adds for this site.
Every application in Wychavon · Alerts for applications and incidents near here
Timeline
- 9 September 2020 Planning application submitted
- 6 January 2021 Planning permission granted
- 27 March 2026 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Littleton Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Littleton Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Littleton Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Littleton Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 April 2026.
- Where is Littleton Solar Farm?
- 6 km south of Bidford-on-Avon, Worcestershire, United Kingdom (postcode WR11 8YF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).