Onshore wind · United Kingdom

Lissett Airfield Wind Farm

Operator Novera Energy · Owner Infinis Storage Limited

Operational30 MWData checked 16 November 2026Source record dated 9 June 2010

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lissett Airfield Wind Farm is a 30 MW wind farm 10 km east of Driffield, Humberside, United Kingdom. Its planning application (06/05618/STPLFE) went to East Riding of Yorkshire on 10 July 2006 and was granted on 22 February 2007. It has been operating since 20 February 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 5 other sites and 240 energy sites within 40 km for Lissett Airfield Wind Farm

Members see the sites and incidents around this one, and every record behind them.

NOVERA ENERGY LIMITED (06163576), dissolved, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Novera Energy
Owner
Infinis Storage Limited
Location
1.5km west of Lisset, East Yorkshire, Humberside, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
06/05618/STPLFE
First operating
2009
Turbines
12

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 06/05618/STPLFE, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 10 July 2006 Planning application submitted
  • 22 February 2007 Planning permission granted
  • 20 February 2009 Operational

None found. The register holds no published incident that names Lissett Airfield Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lissett Airfield Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lissett Airfield Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Lissett Airfield Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2010.
Where is Lissett Airfield Wind Farm?
10 km east of Driffield, Humberside, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).