← Back to Fife

Onshore wind · United Kingdom

Lingo Wind Farm

Operator Lingo Wind Energy Ltd

Appeal Refused12.5 MWData checked 16 November 2026Source record dated 8 October 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lingo Wind Farm is a 12.5 MW wind farm 7.4 km south of Saint Andrews, Fife, United Kingdom. Its planning application (12/00129/EIA) went to Fife on 23 January 2012 and was refused on appeal on 4 October 2013. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 14 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

215 energy sites within 40 km for Lingo Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
12.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Lingo Wind Energy Ltd
Location
Lingo Farm, Lingo, Fife, Fife, United Kingdom
Planning authority
Fife
Planning application
12/00129/EIA
Appeal reference
PPA-250-2153
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/00129/EIA, with what the planning evidence pack adds for this site.

Every application in Fife · Alerts for applications and incidents near here

  • 23 January 2012 Planning application submitted
  • 31 January 2013 Planning permission refused
  • 4 October 2013 Appeal refused

None found. The register holds no published incident that names Lingo Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lingo Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lingo Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Lingo Wind Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2013.
Where is Lingo Wind Farm?
7.4 km south of Saint Andrews, Fife, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).