Solar · United Kingdom

Linford Wood Business Park, Linford Wood - Solar Panels

Operator Regional REIT

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 12 April 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Linford Wood Business Park, Linford Wood - Solar Panels is a 0.4 MW solar farm on the edge of Milton Keynes, Buckinghamshire, United Kingdom. Its planning application (24/00245/PRIOR) went to Milton Keynes on 5 February 2024 and was granted on 20 March 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 111 other energy sites within 10 km, 62 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Linford Wood Business Park, Linford Wood - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof26 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough28 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering38 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Regional REIT
Location
Linford Wood Business Park Linford Wood, Buckinghamshire, MK14 6LQ, United Kingdom
Planning authority
Milton Keynes
Planning application
24/00245/PRIOR

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00245/PRIOR, with what the planning evidence pack adds for this site.

Every application in Milton Keynes · Alerts for applications and incidents near here

  • 20 March 2015 Planning permission expired
  • 5 February 2024 Planning application submitted
  • 20 March 2024 Planning permission granted

None found. The register holds no published incident that names Linford Wood Business Park, Linford Wood - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Linford Wood Business Park, Linford Wood - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Linford Wood Business Park, Linford Wood - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Linford Wood Business Park, Linford Wood - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2024.
Where is Linford Wood Business Park, Linford Wood - Solar Panels?
On the edge of Milton Keynes, Buckinghamshire, United Kingdom (postcode MK14 6LQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).