Planning pack for this site, £295Other options

Solar · United Kingdom

Heart Internet, Beeston Business Park - Solar Panels

Operator Regional Reit

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 21 January 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Heart Internet, Beeston Business Park - Solar Panels is a 0.6 MW solar farm on the edge of Chilwell, Nottinghamshire, United Kingdom. Its planning application (24/00796/PJ14PA) went to Broxtowe on 28 November 2024 and was granted on 13 January 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 76 other energy sites within 10 km, 51 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Heart Internet, Beeston Business Park - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby22 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge33 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property51 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Regional Reit
Location
Heart Internet Limited, Waterfront House, Beeston Business Park, Technology Drive, Nottingham, Nottinghamshire, NG9 1LA, United Kingdom
Planning authority
Broxtowe
Planning application
24/00796/PJ14PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00796/PJ14PA, with what the planning evidence pack adds for this site.

Every application in Broxtowe · Alerts for applications and incidents near here

  • 28 November 2024 Planning application submitted
  • 13 January 2025 Planning permission granted

None found. The register holds no published incident that names Heart Internet, Beeston Business Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Heart Internet, Beeston Business Park - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Heart Internet, Beeston Business Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Heart Internet, Beeston Business Park - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 January 2025.
Where is Heart Internet, Beeston Business Park - Solar Panels?
On the edge of Chilwell, Nottinghamshire, United Kingdom (postcode NG9 1LA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).