← Back to Highland

Onshore wind · United Kingdom

Limekiln Wind Farm (Extension)

Operator Infinergy & Boralex

Operational21 MWData checked 16 November 2026Source record dated 11 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Limekiln Wind Farm (Extension) is a 21 MW wind farm 13 km south-west of Thurso, Highland, United Kingdom. Its planning application (ECU00002070) went to Scottish Government (S36) on 14 May 2020 and was granted on 6 May 2022. It has been operating since 1 April 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 130 energy sites within 40 km for Limekiln Wind Farm (Extension)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
21 MW (this record)
All phases
101 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Infinergy & Boralex
Location
Broubster Estate, Acheveilan North Estate and Limekiln Estate, southeast of Reay, Caithness, Highland, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00002070
First operating
2025
Turbines
5, 149.9 m to tip

This record is 21 MW, one part of a site built in phases. With Limekiln Wind Farm (79.8 MW) the phases on the register add up to 101 MW. Limekiln Wind Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00002070, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 14 May 2020 Planning application submitted
  • 6 May 2022 Planning permission granted
  • 1 April 2025 Operational

None found. The register holds no published incident that names Limekiln Wind Farm (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Limekiln Wind Farm (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Limekiln Wind Farm (Extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Limekiln Wind Farm (Extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2025.
Where is Limekiln Wind Farm (Extension)?
13 km south-west of Thurso, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).