Onshore wind · United Kingdom
Limekiln Wind Farm (Extension)
Operator Infinergy & Boralex
Operational21 MWData checked 16 November 2026Source record dated 11 April 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Limekiln Wind Farm (Extension) is a 21 MW wind farm 13 km south-west of Thurso, Highland, United Kingdom. Its planning application (ECU00002070) went to Scottish Government (S36) on 14 May 2020 and was granted on 6 May 2022. It has been operating since 1 April 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Limekiln Wind Farm (Extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 21 MW (this record)
- All phases
- 101 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Infinergy & Boralex
- Location
- Broubster Estate, Acheveilan North Estate and Limekiln Estate, southeast of Reay, Caithness, Highland, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00002070
- First operating
- 2025
- Turbines
- 5, 149.9 m to tip
This record is 21 MW, one part of a site built in phases. With Limekiln Wind Farm (79.8 MW) the phases on the register add up to 101 MW. Limekiln Wind Farm
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00002070, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 14 May 2020 Planning application submitted
- 6 May 2022 Planning permission granted
- 1 April 2025 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Limekiln Wind Farm (Extension). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Limekiln Wind Farm (Extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Limekiln Wind Farm (Extension); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Limekiln Wind Farm (Extension)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2025.
- Where is Limekiln Wind Farm (Extension)?
- 13 km south-west of Thurso, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).