← Back to Texas

Solar · United States

Lily Solar Hybrid

Operator Lily Solar, LLC

Operational147 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lily Solar Hybrid is a 147 MW solar farm 13 km south-west of Kaufman, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 22 energy sites within 40 km for Lily Solar Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
147 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Lily Solar, LLC
Owner
Lily Solar, LLC
Location
Kaufman County, Texas, United States
First operating
2021
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Lily Solar Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lily Solar Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lily Solar Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Lily Solar Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Lily Solar Hybrid?
13 km south-west of Kaufman, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).