Around this site

← Back to Liaoning

Solar · China

Liaoning Nanpiao Wujintang Babailong solar farm

Planned (permitted)20 MWChecked 8 October 2026Last changed in the dataset 4 April 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Liaoning Nanpiao Wujintang Babailong solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
20 MW
Status
Planned (permitted) (Pre-construction)
Operator
Huludao Ningzhi Solar Power
Owner
Huludao Qiancheng Energy Co Ltd [100%]
Location
Wujintang, Huludao, Liaoning, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Liaoning Nanpiao Wujintang Babailong solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.