Around this site

← Back to Liaoning

Onshore wind · China

Liaoning Beipiao (Guoneng) wind farm

Operational200 MWChecked 8 October 2026Last changed in the dataset 20 October 2025

Technology
Onshore wind
Capacity
200 MW
Status
Operational (Operating)
Operator
Guoneng Liaoning New Energy Development
Owner
Guodian Northeast Electric Power Co Ltd [100%]
Location
Chaoyang, Liaoning, China
First operating
2024

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Liaoning Beipiao (Guoneng) wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.