Awaiting Construction4 MWData checked 16 November 2026Source record dated 31 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leyland Trucks Limited, Croston Road - Solar Panels is a 4 MW solar farm on the edge of Leyland, Lancashire, United Kingdom. Its planning application (07/2024/00268/PAP) went to South Ribble on 9 April 2024 and was granted on 21 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leyland Trucks Limited, Croston Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school27 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof64 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent80 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Leyland Trucks Limited
Location
Leyland Trucks Limited, Croston Road, Farington Moss, Leyland, Lancashire, PR26 6LZ, United Kingdom
Planning authority
South Ribble
Planning application
07/2024/00268/PAP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/2024/00268/PAP, with what the planning evidence pack adds for this site.

Every application in South Ribble · Alerts for applications and incidents near here

  • 9 April 2024 Planning application submitted
  • 21 May 2024 Planning permission granted
  • 21 May 2029 Planning permission runs out

None found. The register holds no published incident that names Leyland Trucks Limited, Croston Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Leyland Trucks Limited, Croston Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leyland Trucks Limited, Croston Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leyland Trucks Limited, Croston Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2024.
Where is Leyland Trucks Limited, Croston Road - Solar Panels?
On the edge of Leyland, Lancashire, United Kingdom (postcode PR26 6LZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).