← Back to Lincolnshire

Solar · United Kingdom

Leverton Ings

Operator Hazel Capital LLP

Operational12 MWData checked 16 November 2026Source record dated 28 May 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leverton Ings is a 12 MW solar farm 7.7 km north-east of Boston, Lincolnshire, United Kingdom. Its planning application (B/13/0306) went to Boston on 14 August 2013 and was granted on 15 October 2013. It has been operating since 28 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 219 energy sites within 40 km for Leverton Ings

Members see the sites and incidents around this one, and every record behind them.

HAZEL CAPITAL LLP (OC420225), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hazel Capital LLP
Location
Land at Leverton Ings, Leverton, Boston, Lincolnshire, Lincolnshire, United Kingdom
Planning authority
Boston
Planning application
B/13/0306
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/13/0306, with what the planning evidence pack adds for this site.

Every application in Boston · Alerts for applications and incidents near here

  • 14 August 2013 Planning application submitted
  • 15 October 2013 Planning permission granted
  • 3 January 2014 Construction started
  • 28 March 2014 Operational

None found. The register holds no published incident that names Leverton Ings. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Leverton Ings had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leverton Ings; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leverton Ings?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2014.
Where is Leverton Ings?
7.7 km north-east of Boston, Lincolnshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).