← Back to Lincolnshire

Energy sites / United Kingdom / Lincolnshire

Solar · United Kingdom

Leverton Ings

Operational12 MWChecked 6 October 2026Last changed in the dataset 28 May 2014

Technology
Solar
Capacity
12 MW
Status
Operational
Operator or applicant
Hazel Capital LLP
Location
Land at Leverton Ings, Leverton, Boston, Lincolnshire, Lincolnshire, United Kingdom
Planning authority
Boston
Planning application
B/13/0306
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 14 August 2013 Planning application submitted
  • 15 October 2013 Planning permission granted
  • 3 January 2014 Construction started
  • 28 March 2014 Operational

None found. The register holds no published incident that names Leverton Ings. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.