Planning pack for this site, £295Other options

Battery storage · United Kingdom

Leithenwater Wind Energy Hub - Wind Farm

Operator Belltown Power Limited

Application Submitted10 MWData checked 16 November 2026Source record dated 14 June 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Leithenwater Wind Energy Hub - Wind Farm is a 10 MW battery storage site in Peebles, Scottish Borders, United Kingdom. Its planning application (ECU00004619) went to Scottish Government (S36) on 4 April 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 8 other energy sites within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BELLTOWN POWER UK LIMITED (09677724), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leithenwater Wind Energy Hub - Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 252 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool252 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells312 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire446 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Belltown Power Limited
Location
Leithenwater Wind Energy Hub, 4.5km NE/O Peebles, Peebles, Scottish Borders, BS1, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004619

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004619, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 4 April 2024 Planning application submitted

None found. The register holds no published incident that names Leithenwater Wind Energy Hub - Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Leithenwater Wind Energy Hub - Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leithenwater Wind Energy Hub - Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leithenwater Wind Energy Hub - Wind Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 14 June 2024.
Where is Leithenwater Wind Energy Hub - Wind Farm?
In Peebles, Scottish Borders, United Kingdom (postcode BS1).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).