Onshore wind · United Kingdom
Bowbeat Emly Bank / Rough Side
Operator PowerGen and Natural Power
Operational31.2 MWData checked 16 November 2026Source record dated 10 February 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bowbeat Emly Bank / Rough Side is a 31.2 MW wind farm 9.6 km north-east of Peebles, Borders, United Kingdom. Its planning application (00/00371/FUL) went to Scottish Borders on 23 March 2000 and was granted on 14 August 2000. It has been operating since 15 September 2002. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bowbeat Emly Bank / Rough Side changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 31.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- PowerGen and Natural Power
- Location
- Roughside Moss, Peebles, Borders, United Kingdom
- Planning authority
- Scottish Borders
- Planning application
- 00/00371/FUL
- First operating
- 2002
- Turbines
- 24, 80 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 00/00371/FUL, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 23 March 2000 Planning application submitted
- 14 August 2000 Planning permission granted
- 15 September 2002 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bowbeat Emly Bank / Rough Side. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bowbeat Emly Bank / Rough Side had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bowbeat Emly Bank / Rough Side; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bowbeat Emly Bank / Rough Side?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2011.
- Where is Bowbeat Emly Bank / Rough Side?
- 9.6 km north-east of Peebles, Borders, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).