Solar · United Kingdom
Leadenham Poultry Unit, Sleaford Road - Solar Panels
Operator Sutherland Farms Limited
Application Withdrawn0.3 MWData checked 16 November 2026Source record dated 3 May 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Leadenham Poultry Unit, Sleaford Road - Solar Panels is a 0.3 MW solar farm 14 km east of Newark on Trent, Lincolnshire, United Kingdom. Its planning application (24/0306/PNREN) went to North Kesteven on 6 March 2024 and was withdrawn on 23 April 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 21 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Leadenham Poultry Unit, Sleaford Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Sutherland Farms Limited
- Location
- Leadenham Poultry Unit, Sleaford Road, Sleaford, Lincoln, Lincolnshire, LN5 0QY, United Kingdom
- Planning authority
- North Kesteven
- Planning application
- 24/0306/PNREN
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/0306/PNREN, with what the planning evidence pack adds for this site.
Every application in North Kesteven · Alerts for applications and incidents near here
Timeline
- 6 March 2024 Planning application submitted
- 23 April 2024 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Leadenham Poultry Unit, Sleaford Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Leadenham Poultry Unit, Sleaford Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Leadenham Poultry Unit, Sleaford Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Leadenham Poultry Unit, Sleaford Road - Solar Panels?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
- Where is Leadenham Poultry Unit, Sleaford Road - Solar Panels?
- 14 km east of Newark on Trent, Lincolnshire, United Kingdom (postcode LN5 0QY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).