Around this site

← Back to Cantabria

Onshore wind · Spain

Lantueno (Green Capital Power) wind farm

Cancelled (shelved)45 MWChecked 8 October 2026Last changed in the dataset 7 March 2025

Technology
Onshore wind
Capacity
45 MW
Status
Cancelled (shelved) (Shelved)
Operator
Green Capital Development 54
Location
Campoo de Enmedio, Cantabria, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Lantueno (Green Capital Power) wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.