Solar · United Kingdom
Land To The South Of Todderstaffe
Operator Solar Power Inc UK Services/SPI China (HK)
Operational4.5 MWData checked 16 November 2026Source record dated 20 July 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land To The South Of Todderstaffe is a 4.5 MW solar farm on the edge of Poulton-le-Fylde, Lancashire, United Kingdom. Its planning application (15/0380) went to Fylde on 18 June 2015 and was granted on 17 November 2015. It has been operating since 28 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land To The South Of Todderstaffe changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Solar Power Inc UK Services/SPI China (HK)
- Location
- Ld To The S Of Todderstaffe Ha, Singleton, Weeton With Preese, Poulton-Le-Fylde, Lancashire, Lancashire, FY6 8LF, United Kingdom
- Planning authority
- Fylde
- Planning application
- 15/0380
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/0380, with what the planning evidence pack adds for this site.
Every application in Fylde · Alerts for applications and incidents near here
Timeline
- 18 June 2015 Planning application submitted
- 17 November 2015 Planning permission granted
- 4 January 2016 Construction started
- 28 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land To The South Of Todderstaffe. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land To The South Of Todderstaffe had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land To The South Of Todderstaffe; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land To The South Of Todderstaffe?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 July 2017.
- Where is Land To The South Of Todderstaffe?
- On the edge of Poulton-le-Fylde, Lancashire, United Kingdom (postcode FY6 8LF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).