← Back to Hampshire

Solar · United Kingdom

Land South of Shothanger Works

Operator Solar Planning

Application Refused3.5 MWData checked 16 November 2026Source record dated 2 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land South of Shothanger Works is a 3.5 MW solar farm 4.5 km north-west of Basingstoke, Hampshire, United Kingdom. Its planning application (15/01378/FUL) went to Basingstoke and Deane on 11 June 2015 and was refused on 19 November 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 34 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 366 energy sites within 40 km for Land South of Shothanger Works

Members see the sites and incidents around this one, and every record behind them.

SOLAR PLANNING LTD (08314220), dissolved, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Solar Planning
Location
Land Near Shothanger Works, Shothanger Lane, Wootton St Lawrence, Basingstoke, Hampshire, Hampshire, RG23 8TH, United Kingdom
Planning authority
Basingstoke and Deane
Planning application
15/01378/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/01378/FUL, with what the planning evidence pack adds for this site.

Every application in Basingstoke and Deane · Alerts for applications and incidents near here

  • 11 June 2015 Planning application submitted
  • 19 November 2015 Planning permission refused

None found. The register holds no published incident that names Land South of Shothanger Works. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land South of Shothanger Works had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land South of Shothanger Works; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land South of Shothanger Works?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2015.
Where is Land South of Shothanger Works?
4.5 km north-west of Basingstoke, Hampshire, United Kingdom (postcode RG23 8TH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).