Solar · United Kingdom

Land NW Of Pickhill Bridge Farm

Operator NextEnergy Solar Fund

Operational3.6 MWData checked 16 November 2026Source record dated 20 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land NW Of Pickhill Bridge Farm is a 3.6 MW solar farm 5.1 km south-east of Wrexham, Clwyd, United Kingdom. Its planning application (P/2015/0287) went to Wrexham on 13 April 2015 and was granted on 31 July 2015. It has been operating since 24 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

299 energy sites within 40 km for Land NW Of Pickhill Bridge Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
3.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NextEnergy Solar Fund
Location
Land NW Of Pickhill Bridge Far, Holt Road, Cross Lanes, Wrexham, Clwyd, Clwyd, LL13 0UA, United Kingdom
Planning authority
Wrexham
Planning application
P/2015/0287
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2015/0287, with what the planning evidence pack adds for this site.

Every application in Wrexham · Alerts for applications and incidents near here

  • 13 April 2015 Planning application submitted
  • 31 July 2015 Planning permission granted
  • 19 December 2016 Construction started
  • 24 March 2017 Operational

None found. The register holds no published incident that names Land NW Of Pickhill Bridge Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land NW Of Pickhill Bridge Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land NW Of Pickhill Bridge Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land NW Of Pickhill Bridge Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 December 2017.
Where is Land NW Of Pickhill Bridge Farm?
5.1 km south-east of Wrexham, Clwyd, United Kingdom (postcode LL13 0UA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).