Solar · United Kingdom
Land East of Horton Road
Operator NESF (formerly Lark Energy)
Operational4.9 MWData checked 16 November 2026Source record dated 5 July 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land East of Horton Road is a 4.9 MW solar farm 6.2 km east of Hardingstone, Northamptonshire, United Kingdom. Its planning application (S/2014/2075/MAF) went to West Northamptonshire on 20 October 2014 and was granted on 1 May 2015. It has been operating since 7 July 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 52 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land East of Horton Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- NESF (formerly Lark Energy)
- Location
- Land East of Horton Road Brafield on the Green, Northamptonshire, NN7 1DN, United Kingdom
- Planning authority
- West Northamptonshire
- Planning application
- S/2014/2075/MAF
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for S/2014/2075/MAF, with what the planning evidence pack adds for this site.
Every application in West Northamptonshire · Alerts for applications and incidents near here
Timeline
- 20 October 2014 Planning application submitted
- 1 May 2015 Planning permission granted
- 31 January 2016 Construction started
- 7 July 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Land East of Horton Road. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land East of Horton Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land East of Horton Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land East of Horton Road?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 July 2018.
- Where is Land East of Horton Road?
- 6.2 km east of Hardingstone, Northamptonshire, United Kingdom (postcode NN7 1DN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).