Land At Ferry Farm

Operator BNRG (sold to another developer)

Operational10 MWData checked 16 November 2026Source record dated 16 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land At Ferry Farm is a 10 MW solar farm on the edge of Selsey, West Sussex, United Kingdom. Its planning application (14/03944/FULEIA) went to Chichester on 10 December 2014 and was granted on 7 April 2015. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

184 energy sites within 40 km for Land At Ferry Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
BNRG (sold to another developer)
Location
Ferry Farm, Chichester Road, Selsey, Chichester, West Sussex, West Sussex, PO20 9ED, United Kingdom
Planning authority
Chichester
Planning application
14/03944/FULEIA
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/03944/FULEIA, with what the planning evidence pack adds for this site.

Every application in Chichester · Alerts for applications and incidents near here

  • 10 December 2014 Planning application submitted
  • 7 April 2015 Planning permission granted
  • 1 November 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Land At Ferry Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land At Ferry Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land At Ferry Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land At Ferry Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2017.
Where is Land At Ferry Farm?
On the edge of Selsey, West Sussex, United Kingdom (postcode PO20 9ED).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).