← Back to Wiltshire

Solar · United Kingdom

Land at Beech Farm

Operator Vortex (formerly SunEdison)

Operational4.6 MWData checked 16 November 2026Source record dated 2 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Beech Farm is a 4.6 MW solar farm 3.3 km south-west of Highworth, Wiltshire, United Kingdom. Its planning application (S/LDO/15/1133) went to Swindon on 6 July 2015 and was granted on 28 August 2015. It has been operating since 17 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 57 other energy sites within 10 km, 38 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 372 energy sites within 40 km for Land at Beech Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vortex (formerly SunEdison)
Location
Beech Farm, Stanton, Fitzwarren, Swindon, Wiltshire, United Kingdom
Planning authority
Swindon
Planning application
S/LDO/15/1133
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/LDO/15/1133, with what the planning evidence pack adds for this site.

Every application in Swindon · Alerts for applications and incidents near here

  • 6 July 2015 Planning application submitted
  • 28 August 2015 Planning permission granted
  • 17 February 2016 Operational
  • 1 May 2016 Construction started

None found. The register holds no published incident that names Land at Beech Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Beech Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Beech Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Beech Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2017.
Where is Land at Beech Farm?
3.3 km south-west of Highworth, Wiltshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).