Around this site

← Back to Paraíba

Solar · Brazil

Lagoa Solar Park

Cancelled65.8 MWChecked 8 October 2026Last changed in the dataset 7 November 2025

Technology
Solar
Capacity
65.8 MW
Status
Cancelled
Operator
Central Solar Lagoa
Owner
EDP Renováveis [100%]
Location
São José da Lagoa Tapada, Região Geográfica Intermediária de Sousa-Cajazeiras, Paraíba, Brazil
Phases in the tracker
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Lagoa Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.