← Back to Somerset

Solar · United Kingdom

Lag Farm

Operator Yeo Valley Farms

Operational1 MWData checked 16 November 2026Source record dated 30 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lag Farm is a 1 MW solar farm 7.8 km north-east of Cheddar, Somerset, United Kingdom. Its planning application (19/P/3087/SJA) went to North Somerset on 11 December 2019 and was granted on 27 January 2020. It has been operating since 1 January 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

554 energy sites within 40 km for Lag Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Yeo Valley Farms
Location
Lag Farm, Bath Road, Blagdon, Bristol, Avon, Somerset, BS40 7SG, United Kingdom
Planning authority
North Somerset
Planning application
19/P/3087/SJA
First operating
2020

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 19/P/3087/SJA, with what the planning evidence pack adds for this site.

Every application in North Somerset · Alerts for applications and incidents near here

  • 11 December 2019 Planning application submitted
  • 1 January 2020 Operational
  • 27 January 2020 Planning permission granted

None found. The register holds no published incident that names Lag Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lag Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lag Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lag Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2020.
Where is Lag Farm?
7.8 km north-east of Cheddar, Somerset, United Kingdom (postcode BS40 7SG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).