Planning pack for this site, £295Other options

Solar · United Kingdom

Knockkippen Wind, Solar & Battery Farm

Operator Falck Renewables & REG Windpower

Awaiting Construction20 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Knockkippen Wind, Solar & Battery Farm is a 20 MW solar farm 17 km south-east of Ayr, East Ayrshire, United Kingdom. Its planning application (ECU00004523) went to Scottish Government (S36) on 24 June 2022 and was granted on 30 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knockkippen Wind, Solar & Battery Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 239 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool239 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells330 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire437 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Falck Renewables & REG Windpower
Location
Knockkippen Moss, East Ayrshire, KA6 7JH, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004523

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004523, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 24 June 2022 Planning application submitted
  • 30 April 2025 Planning permission granted
  • 30 April 2028 Planning permission runs out

None found. The register holds no published incident that names Knockkippen Wind, Solar & Battery Farm. If you know of one, report it (confidential reports are anonymised).

Has Knockkippen Wind, Solar & Battery Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Knockkippen Wind, Solar & Battery Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Knockkippen Wind, Solar & Battery Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Knockkippen Wind, Solar & Battery Farm?
17 km south-east of Ayr, East Ayrshire, United Kingdom (postcode KA6 7JH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).