Onshore wind · United Kingdom
Knockkippen Wind, Solar & Battery Farm
Operator Falck Renewables & REG Windpower
Awaiting Construction60 MWData checked 16 November 2026Source record dated 1 July 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Knockkippen Wind, Solar & Battery Farm is a 60 MW wind farm 17 km south-east of Ayr, East Ayrshire, United Kingdom. Its planning application (ECU00004523) went to Scottish Government (S36) on 24 June 2022 and was granted on 30 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Knockkippen Wind, Solar & Battery Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Knockkippen Wind, Solar & Battery Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 239 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 239 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 330 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 437 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 60 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Falck Renewables & REG Windpower
- Location
- Knockkippen Moss, East Ayrshire, KA6 7JH, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00004523
- Turbines
- 12, 180 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00004523, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 24 June 2022 Planning application submitted
- 30 April 2025 Planning permission granted
- 30 April 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Knockkippen Wind, Solar & Battery Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Knockkippen Wind, Solar & Battery Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Knockkippen Wind, Solar & Battery Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Knockkippen Wind, Solar & Battery Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
- Where is Knockkippen Wind, Solar & Battery Farm?
- 17 km south-east of Ayr, East Ayrshire, United Kingdom (postcode KA6 7JH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).