Solar · Germany

Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3

Operator Axpo Kippenheim PV-Anlage

Operational4.3 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3 is a 4.3 MW solar farm 3.2 km north of Kippenheim, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 21 other energy sites within 10 km, 8 of them solar farms. The register holds no incident at this site. It holds 6 incidents at solar farms in Germany, and 458 worldwide.

The operator's 3 other sites and 126 energy sites within 40 km for Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.3 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
Axpo Kippenheim PV-Anlage
Location
Kippenheim, Ortenaukreis, Baden-Württemberg, 77971, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 5 May 2026 Operational

None found. The register holds no published incident that names Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3 had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3; it holds 6 incidents at solar farms in Germany.
What is the status of Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Kippenheim Solaranlage 2nd batch 5 MW Transformer Station 3?
3.2 km north of Kippenheim, Germany (postcode 77971).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).