Battery storage · United Kingdom
Kings Barn Farm - Energy Barn
Operator Anesco& Green Hedge Energy UK
Operational10 MWData checked 16 November 2026Source record dated 15 March 2019
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Kings Barn Farm - Energy Barn is a 10 MW battery storage site in Steyning, West Sussex, United Kingdom. Its planning application (DC/16/1648) went to Horsham on 22 July 2016. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Kings Barn Farm - Energy Barn changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Anesco& Green Hedge Energy UK
- Location
- Kings Barn Farm, Steyning, West Sussex, West Sussex, BN44 3YR, United Kingdom
- Planning authority
- Horsham
- Planning application
- DC/16/1648
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/16/1648, with what the planning evidence pack adds for this site.
Every application in Horsham · Alerts for applications and incidents near here
Timeline
- 22 July 2016 Planning application submitted
- 15 December 2016 Construction started
- 31 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Kings Barn Farm - Energy Barn. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Kings Barn Farm - Energy Barn had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kings Barn Farm - Energy Barn; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Kings Barn Farm - Energy Barn?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 March 2019.
- Where is Kings Barn Farm - Energy Barn?
- In Steyning, West Sussex, United Kingdom (postcode BN44 3YR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).