Solar · United Kingdom
Kingmoor Park Solar Farm Extension
Operator Push Energy · Owner Push Renewco Limited
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 24 February 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kingmoor Park Solar Farm Extension is a 0.3 MW solar farm 4.5 km north-west of Carlisle, Cumbria, United Kingdom. Its planning application (21/0826) went to Cumberland on 6 September 2021 and was granted on 17 February 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Kingmoor Park Solar Farm Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PUSH ENERGY LIMITED (11963582), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kingmoor Park Solar Farm Extension sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 56 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 56 km | Significant |
| EIR-1499 | 2025 | Solar panels linked to fires at council buildings in Northumberland | 90 km | Significant |
| EIR-2721 | 2025 | Solar panel fire breaks out at Shanklea Primary School | 90 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Push Energy
- Owner
- Push Renewco Limited
- Location
- W/o Dukes Drive, Kingmoor Park North, Carlisle, Cumbria, CA6 4FB, United Kingdom
- Planning authority
- Cumberland
- Planning application
- 21/0826
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/0826, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 6 September 2021 Planning application submitted
- 17 February 2022 Planning permission granted
- 17 February 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Kingmoor Park Solar Farm Extension. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Kingmoor Park Solar Farm Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kingmoor Park Solar Farm Extension; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Kingmoor Park Solar Farm Extension?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2022.
- Where is Kingmoor Park Solar Farm Extension?
- 4.5 km north-west of Carlisle, Cumbria, United Kingdom (postcode CA6 4FB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).