← Back to California
Planning pack for this site, £295Other options

Solar · United States

JVR Energy Park LLC

Operator JVR Energy Park LLC

Under construction90 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

JVR Energy Park LLC is a 90 MW solar farm 43 km east of Tecate, San Diego County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 5 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for JVR Energy Park LLC sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-2224, Small fire on solar panel at Yuma middle school, 146 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22242023Small fire on solar panel at Yuma middle school146 kmMinor
EIR-12402018Solar system reported to have caught fire at an Amazon warehouse in Redlands184 kmSignificant
EIR-11782026Lithium ion battery fire at Metropolitan Water District facility La Verne221 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
90 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
JVR Energy Park LLC
Owner
JVR Energy Park LLC
Location
San Diego County, California, United States
Expected
2027
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

Status changed from Planned to Under construction on 26 October 2026.

None found. The register holds no published incident that names JVR Energy Park LLC. If you know of one, report it (confidential reports are anonymised).

Has JVR Energy Park LLC had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names JVR Energy Park LLC; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of JVR Energy Park LLC?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M, where it last changed on 26 October 2026.
Where is JVR Energy Park LLC?
43 km east of Tecate, San Diego County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).