Battery storage · United Kingdom
Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System)
Operator Green Frog Power Limited · Owner Pulse Clean Energy UK Limited
Operational20 MWData checked 16 November 2026Source record dated 24 January 2023
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System) is a 20 MW battery storage site 3.1 km east of Swansea, West Glamorgan, United Kingdom. Its planning application (2022/2356/FUL) went to Swansea on 17 October 2022 and was granted on 20 January 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 52 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
A day out costs this site about £598 at its earnings over the last 13 settled days (response and reserve auctions). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
GREEN FROG POWER LIMITED (13352043), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational (Planning Permission Granted)
- Operator or applicant
- Green Frog Power Limited
- Owner
- Pulse Clean Energy UK Limited
- Location
- Tir John Green Frog Power Compound Tir, John North Road, Port Tennant, West Glamorgan, SA1 8NS, United Kingdom
- Planning authority
- Swansea
- Planning application
- 2022/2356/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2022/2356/FUL, with what the planning evidence pack adds for this site.
Every application in Swansea · Alerts for applications and incidents near here
Timeline
- 17 October 2022 Planning application submitted
- 20 January 2023 Planning permission granted
- 20 January 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2023.
- Where is Tir John North Road Battery Storage (John Green Frog Power Compound, John North Road - Battery System)?
- 3.1 km east of Swansea, West Glamorgan, United Kingdom (postcode SA1 8NS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).