Battery storage · United Kingdom
Swansea University, Fabian Way - Battery Energy Storage
Operator Swansea University
Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 14 December 2022
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Swansea University, Fabian Way - Battery Energy Storage is a 0.5 MW battery storage site 4.3 km west of Briton Ferry, West Glamorgan, United Kingdom. Its planning application (P2022/0748) went to Neath Port Talbot on 9 September 2022 and was granted on 6 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 19 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Swansea University, Fabian Way - Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Swansea University, Fabian Way - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 102 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 102 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 135 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 208 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Swansea University
- Location
- Swansea University Bay Campus, Fabian Way, Crymlyn Burrows, Swansea, West Glamorgan, SA1 8EN, United Kingdom
- Planning authority
- Neath Port Talbot
- Planning application
- P2022/0748
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P2022/0748, with what the planning evidence pack adds for this site.
Every application in Neath Port Talbot · Alerts for applications and incidents near here
Timeline
- 9 September 2022 Planning application submitted
- 6 December 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Swansea University, Fabian Way - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Swansea University, Fabian Way - Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Swansea University, Fabian Way - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Swansea University, Fabian Way - Battery Energy Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2022.
- Where is Swansea University, Fabian Way - Battery Energy Storage?
- 4.3 km west of Briton Ferry, West Glamorgan, United Kingdom (postcode SA1 8EN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).