Around this site

← Back to Jilin

Onshore wind · China

Jilin Tongyu Xiangrong wind farm

Operational300 MWChecked 8 October 2026Last changed in the dataset 17 December 2025

Technology
Onshore wind
Capacity
300 MW
Status
Operational (Operating)
Operator
Jilin Renewable Energy Investment and Development
Owner
Jilin Provincial Coal Industry Group Co Ltd [49%]; unknown [51%]; Huaneng Jilin Power Generation Co Ltd
Location
Hongxing, Baicheng, Jilin, China
First operating
2023
Phases in the tracker
2

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Jilin Tongyu Xiangrong wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.