← Back to New Hampshire

Energy sites / United States / New Hampshire

Onshore wind · United States

Jericho Power

Operational14.3 MWChecked 6 October 2026

Technology
Onshore wind
Capacity
14.3 MW
Status
Operational
Operator
Jericho Power LLC
Location
Coos County, New Hampshire, United States
First operating
2016
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Jericho Power. If you know of one, report it (confidential reports are anonymised).

The register holds 95 incidents at onshore wind farms in the United States, 32 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.