← Back to Highland

Battery storage · United Kingdom

Isle of Eigg Electrification Project

Operator Eigg Electric

Operational0.1 MWData checked 16 November 2026Source record dated 29 April 2016

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Isle of Eigg Electrification Project is a 0.1 MW battery storage site Highland, United Kingdom. Its planning application went to Highland. It has been operating since 1 June 2008. Its status in the Renewable Energy Planning Database (UK government) is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

5 energy sites within 40 km for Isle of Eigg Electrification Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Capacity
0.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Eigg Electric
Location
Isle of Eigg, Highland Scotland, Highland, PH42 4RL, United Kingdom
Planning authority
Highland
First operating
2008

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 1 May 2008 Construction started
  • 1 June 2008 Operational

None found. The register holds no published incident that names Isle of Eigg Electrification Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Isle of Eigg Electrification Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Isle of Eigg Electrification Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Isle of Eigg Electrification Project?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 April 2016.
Where is Isle of Eigg Electrification Project?
Highland, United Kingdom (postcode PH42 4RL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.