Inveroykel Wind Farm

Operator RWE Renewables UK Swindon Limited · Owner Rwe Renewables UK Holdings Limited

Application Submitted132 MWData checked 16 November 2026Source record dated 21 April 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Inveroykel Wind Farm is a 132 MW wind farm 34 km north-west of Alness, Highland, United Kingdom. Its planning application (ECU00005210) went to Scottish Government (S36) on 6 February 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 12 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

RWE RENEWABLES UK SWINDON LIMITED (02550622), active, since 1990. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Inveroykel Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 133 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm133 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK133 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment133 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
132 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
RWE Renewables UK Swindon Limited
Owner
Rwe Renewables UK Holdings Limited
Location
1.5km S/O 2 Easter Kilmachalmack, Strathkyle, Ardgay, Highland, IV24 3DP, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00005210
Turbines
20, 230 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00005210, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 6 February 2026 Planning application submitted

None found. The register holds no published incident that names Inveroykel Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Inveroykel Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Inveroykel Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Inveroykel Wind Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 21 April 2026.
Where is Inveroykel Wind Farm?
34 km north-west of Alness, Highland, United Kingdom (postcode IV24 3DP).