← Back to Inner Mongol

Onshore wind · China

Inner Mongolia Goldwind Damao Phase 2

Operational49 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Inner Mongolia Goldwind Damao Phase 2 is a 49 MW wind farm 31 km west of Tongyangdao, Inner Mongol, China. Its status in the Global Power Plant Database (World Resources Institute) is operational. There are 5 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 9 incidents at wind farms in China, and 362 worldwide.

37 energy sites within 40 km for Inner Mongolia Goldwind Damao Phase 2

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
49 MW (this record)
All phases
98 MW, the phases on the register added up
Capacity figure from
Global Power Plant Database (World Resources Institute)
Status
Operational (Operational as reported in 2021)
Location
Inner Mongol, China

This record is 49 MW, one part of a site built in phases. With Inner Mongolia Goldwind Damao Phase 3 (49 MW) the phases on the register add up to 98 MW. Inner Mongolia Goldwind Damao Phase 3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Inner Mongolia Goldwind Damao Phase 2. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Inner Mongolia Goldwind Damao Phase 2 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Inner Mongolia Goldwind Damao Phase 2; it holds 9 incidents at wind farms in China.
What is the status of Inner Mongolia Goldwind Damao Phase 2?
Operational, in the Global Power Plant Database (World Resources Institute).
Where is Inner Mongolia Goldwind Damao Phase 2?
31 km west of Tongyangdao, Inner Mongol, China.

Source: Global Power Plant Database v1.3.0, World Resources Institute, licensed under CC BY 4.0. The dataset. This dataset was last updated in 2021; the site may have changed since. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).