Onshore wind · China

Inner Mongolia Abaga Banner Bieligutai (Huaneng) wind farm

Operational201 MWChecked 8 October 2026Last changed in the dataset 14 September 2022

Technology
Onshore wind
Capacity
201 MW
Status
Operational (Operating)
Operator
Huaneng Abaga Banner New Energy Power
Owner
Huaneng New Energy Co Ltd [100%]
Location
Bieligutai, Xilingol League, Inner Mongolia, China
First operating
2020

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Inner Mongolia Abaga Banner Bieligutai (Huaneng) wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.