Solar · United Kingdom

Hyde Farm

Operator Lightsource Renewable Energy & Push Energy

Operational10.8 MWData checked 16 November 2026Source record dated 14 November 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hyde Farm is a 10.8 MW solar farm 9.7 km north of Great Dunmow, Essex, United Kingdom. Its planning application (UTT/13/2207/FUL) went to Uttlesford on 27 August 2013 and was granted on 22 November 2013. It has been operating since 13 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

355 energy sites within 40 km for Hyde Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy & Push Energy
Location
Hydes Solar Farm Little Bardfield Braintree Essex, Essex, United Kingdom
Planning authority
Uttlesford
Planning application
UTT/13/2207/FUL
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for UTT/13/2207/FUL, with what the planning evidence pack adds for this site.

Every application in Uttlesford · Alerts for applications and incidents near here

  • 27 August 2013 Planning application submitted
  • 22 November 2013 Planning permission granted
  • 13 November 2014 Operational

None found. The register holds no published incident that names Hyde Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hyde Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hyde Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hyde Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 November 2014.
Where is Hyde Farm?
9.7 km north of Great Dunmow, Essex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).