Solar · United Kingdom
Hungerford Park - Solar Array
Operator Hungerford Park
Awaiting Construction2.5 MWData checked 16 November 2026Source record dated 5 August 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hungerford Park - Solar Array is a 2.5 MW solar farm on the edge of Hungerford, Berkshire, United Kingdom. Its planning application (24/02810/FULMAJ) went to West Berkshire on 18 February 2025 and was granted on 24 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hungerford Park - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hungerford Park - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 35 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1273 | 2022 | Solar panels believed to have started roof fire at house in Old Basing | 35 km | Minor |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 46 km | Significant |
| EIR-2109 | 2015 | Solar installer falls through fragile farm roof at Kemble, suffering brain injuries | 47 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Hungerford Park
- Location
- N/O Hungerford Footpath 21, S/O Cider Barn, Hungerford Park, Hungerford, Berkshire, RG17 0RT, United Kingdom
- Planning authority
- West Berkshire
- Planning application
- 24/02810/FULMAJ
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/02810/FULMAJ, with what the planning evidence pack adds for this site.
Every application in West Berkshire · Alerts for applications and incidents near here
Timeline
- 18 February 2025 Planning application submitted
- 24 July 2025 Planning permission granted
- 24 July 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Hungerford Park - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hungerford Park - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hungerford Park - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hungerford Park - Solar Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
- Where is Hungerford Park - Solar Array?
- On the edge of Hungerford, Berkshire, United Kingdom (postcode RG17 0RT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).