Solar · United Kingdom

Home Farm

Operator Wirsol Energy

Operational6.7 MWData checked 16 November 2026Source record dated 30 June 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Home Farm is a 6.7 MW solar farm on the edge of Bishops Cleeve, Gloucestershire, United Kingdom. Its planning application (15/00238/FUL) went to Tewkesbury on 3 March 2015 and was granted on 22 October 2015. It has been operating since 31 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

352 energy sites within 40 km for Home Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wirsol Energy
Location
Home Farm, Brockhampton Lane, Brockhampton, Gloucestershire, GL51 9RS, United Kingdom
Planning authority
Tewkesbury
Planning application
15/00238/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00238/FUL, with what the planning evidence pack adds for this site.

Every application in Tewkesbury · Alerts for applications and incidents near here

  • 3 March 2015 Planning application submitted
  • 22 October 2015 Planning permission granted
  • 15 November 2016 Construction started
  • 31 March 2017 Operational

None found. The register holds no published incident that names Home Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Home Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Home Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Home Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 June 2017.
Where is Home Farm?
On the edge of Bishops Cleeve, Gloucestershire, United Kingdom (postcode GL51 9RS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).