Planning pack for this site, £295Other options

Battery storage · United States

Holyoke MA BESS 1

Operator Holyoke MA BESS 1 LLC

Under construction5 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Holyoke MA BESS 1 is a 5 MW battery storage site 4 km north-west of Chicopee, Hampden County, Massachusetts, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There are 22 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Holyoke MA BESS 1 sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-0572, Battery cabinet smokes at solar-plus-storage site in Douglas, Massachusetts, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05722026Battery cabinet smokes at solar-plus-storage site in Douglas, Massachusetts76 kmMinor
EIR-18292023Arc flash damages battery cabinet at Cyxtera BOS1 in Waltham119 kmSignificant
EIR-06432023Fire suppression chemicals linked to toxic groundwater at East Hampton battery plant139 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
5 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Under construction
Operator
Holyoke MA BESS 1 LLC
Owner
Holyoke MA BESS 1 LLC
Location
Hampden County, Massachusetts, United States
Expected
2026
Balancing authority
ISNE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Holyoke MA BESS 1. If you know of one, report it (confidential reports are anonymised).

Has Holyoke MA BESS 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Holyoke MA BESS 1; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Holyoke MA BESS 1?
Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Holyoke MA BESS 1?
4 km north-west of Chicopee, Hampden County, Massachusetts, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).