Planning pack for this site, £295Other options

Onshore wind · Germany

Hohe Molmert

Operator P-Wind Plettenberg GmbH

Planned36 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hohe Molmert is a 36 MW wind farm 3.8 km west of Plettenberg, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 7 other energy sites within 10 km, 6 of them wind farms. The register holds one incident at this site, the latest in 2026.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hohe Molmert sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable onshore wind incidents in Germany, nearest first. The nearest is EIR-2405, Wind turbine blade falls after trailer overturns near Plettenberg, 3.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24052026Wind turbine blade falls after trailer overturns near Plettenberg3.8 kmMinor
EIR-18112023Wind turbine reported to have snapped and collapsed into a field in north-west Germany73 kmMajor
EIR-07992021Wind turbine collapses at Haltern AV9 wind park in Germany73 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
36 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
P-Wind Plettenberg GmbH
Location
Plettenberg, Märkischer Kreis, Nordrhein-Westfalen, 58840, Germany
First operating
2027
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

Has Hohe Molmert had a fire or other incident?
Yes. The register holds one incident that names it: Wind turbine blade falls after trailer overturns near Plettenberg (EIR-2405, 2026).
What is the status of Hohe Molmert?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Hohe Molmert?
3.8 km west of Plettenberg, Germany (postcode 58840).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).