Hoddlesdon Moss

Operator Viridis Wind Turbines

Application Withdrawn2.7 MWData checked 16 November 2026Source record dated 5 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hoddlesdon Moss is a 2.7 MW wind farm 4 km south-east of Darwen, Lancashire, United Kingdom. Its planning application (10/16/0704) went to Blackburn with Darwen on 29 June 2016 and was withdrawn on 25 April 2017. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 31 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 699 energy sites within 40 km for Hoddlesdon Moss

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Viridis Wind Turbines
Location
Hoddlesden Moss, Roman Road, Hoddlesden, Darwen, Lancashire, BB3 3PP, United Kingdom
Planning authority
Blackburn with Darwen
Planning application
10/16/0704
Turbines
3, 77 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 10/16/0704, with what the planning evidence pack adds for this site.

Every application in Blackburn with Darwen · Alerts for applications and incidents near here

  • 29 June 2016 Planning application submitted
  • 25 April 2017 Application withdrawn

None found. The register holds no published incident that names Hoddlesdon Moss. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hoddlesdon Moss had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hoddlesdon Moss; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hoddlesdon Moss?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 5 May 2017.
Where is Hoddlesdon Moss?
4 km south-east of Darwen, Lancashire, United Kingdom (postcode BB3 3PP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).