Battery storage · United Kingdom
Hillend Of Lownie - Forfar Solar farm
Operator Industria Resources Llp
Application RefusedData checked 16 November 2026Source record dated 22 July 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Hillend Of Lownie - Forfar Solar farm is a battery storage site 4.3 km south-east of Forfar, Angus, United Kingdom. Its planning application (23/00393/FULM) went to Angus on 5 June 2023 and was refused on 12 June 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 39 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Hillend Of Lownie - Forfar Solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Industria Resources Llp
- Location
- Cotton Of Lownie Hillend Of Lownie Forfar, Angus, DD8 2NU, United Kingdom
- Planning authority
- Angus
- Planning application
- 23/00393/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00393/FULM, with what the planning evidence pack adds for this site.
Every application in Angus · Alerts for applications and incidents near here
Timeline
- 5 June 2023 Planning application submitted
- 12 June 2024 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Hillend Of Lownie - Forfar Solar farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hillend Of Lownie - Forfar Solar farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hillend Of Lownie - Forfar Solar farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hillend Of Lownie - Forfar Solar farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 22 July 2024.
- Where is Hillend Of Lownie - Forfar Solar farm?
- 4.3 km south-east of Forfar, Angus, United Kingdom (postcode DD8 2NU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).