Onshore wind · United Kingdom
Hill of Balquhindachy extension
Operator Private Developer
Operational1.7 MWData checked 16 November 2026Source record dated 1 June 2010
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hill of Balquhindachy extension is a 1.7 MW wind farm 15 km south-east of Turriff, Grampian, United Kingdom. Its planning application (APP/2007/1191) went to Aberdeenshire on 20 March 2007 and was granted on 9 September 2008. It has been operating since 9 July 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hill of Balquhindachy extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 1.7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Private Developer
- Location
- Methlick, Ellon, Grampian, AB41 7BY, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2007/1191
- First operating
- 2010
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2007/1191, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 20 March 2007 Planning application submitted
- 9 September 2008 Planning permission granted
- 9 July 2010 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hill of Balquhindachy extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hill of Balquhindachy extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hill of Balquhindachy extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hill of Balquhindachy extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 June 2010.
- Where is Hill of Balquhindachy extension?
- 15 km south-east of Turriff, Grampian, United Kingdom (postcode AB41 7BY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).