High Dyke (Mill Farm) is a 5 MW solar farm 4.3 km south-east of Grantham, Lincolnshire, United Kingdom. Its planning application (S15/2137) went to South Kesteven on 11 August 2015 and was granted on 10 November 2015. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 24 other sites and 342 energy sites within 40 km for High Dyke (Mill Farm)

Members see the sites and incidents around this one, and every record behind them.

ISLAND GREEN POWER GROUP LIMITED (15724585), active, since 2024. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Island Green Power
Location
Land west of Boothby Great Woo, High Dyke, Woodnook, Grantham, Lincolnshire, NG33 5AA, United Kingdom
Planning authority
South Kesteven
Planning application
S15/2137
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S15/2137, with what the planning evidence pack adds for this site.

Every application in South Kesteven · Alerts for applications and incidents near here

  • 11 August 2015 Planning application submitted
  • 10 November 2015 Planning permission granted
  • 29 February 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names High Dyke (Mill Farm). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has High Dyke (Mill Farm) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Dyke (Mill Farm); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Dyke (Mill Farm)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2017.
Where is High Dyke (Mill Farm)?
4.3 km south-east of Grantham, Lincolnshire, United Kingdom (postcode NG33 5AA).