Operational0.2 MWData checked 16 November 2026Source record dated 31 October 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Henry Colbeck Office is a 0.2 MW solar farm in Coatbridge, Lanarkshire, United Kingdom. Its planning application (19/00331/FUL) went to North Lanarkshire on 1 April 2019 and was granted on 23 May 2019. It has been operating since 1 March 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 49 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Henry Colbeck Office changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Henry Colbeck
- Location
- 6 South Caldeen Road, Coatbridge, Strathclyde, Lanarkshire, ML5 4EG, United Kingdom
- Planning authority
- North Lanarkshire
- Planning application
- 19/00331/FUL
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/00331/FUL, with what the planning evidence pack adds for this site.
Every application in North Lanarkshire · Alerts for applications and incidents near here
Timeline
- 1 February 2019 Construction started
- 1 March 2019 Operational
- 1 April 2019 Planning application submitted
- 23 May 2019 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Henry Colbeck Office. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Henry Colbeck Office had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Henry Colbeck Office; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Henry Colbeck Office?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 October 2019.
- Where is Henry Colbeck Office?
- In Coatbridge, Lanarkshire, United Kingdom (postcode ML5 4EG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).