Solar · United Kingdom
Hazelrigg Lane, Scotforth - Solar Farm
Operator BeBa Energy UK Limited & University of Lancaster
Under Construction16.5 MWData checked 16 November 2026Source record dated 23 April 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hazelrigg Lane, Scotforth - Solar Farm is a 16.5 MW solar farm on the edge of Lancaster, Lancashire, United Kingdom. Its planning application (21/01247/FUL) went to Lancaster on 7 October 2021 and was granted on 9 March 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 32 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hazelrigg Lane, Scotforth - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hazelrigg Lane, Scotforth - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 62 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 62 km | Significant |
| EIR-2771 | 2024 | Fire involves rooftop solar panels and lithium batteries on Bradford house roof | 75 km | Minor |
| EIR-1502 | 2025 | Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre | 104 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 16.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- BeBa Energy UK Limited & University of Lancaster
- Location
- Hazelrigg Lane Scotforth, Lancaster, Lancashire, LA1, United Kingdom
- Planning authority
- Lancaster
- Planning application
- 21/01247/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/01247/FUL, with what the planning evidence pack adds for this site.
Every application in Lancaster · Alerts for applications and incidents near here
Timeline
- 7 October 2021 Planning application submitted
- 9 March 2022 Planning permission granted
- 9 March 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Hazelrigg Lane, Scotforth - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hazelrigg Lane, Scotforth - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hazelrigg Lane, Scotforth - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hazelrigg Lane, Scotforth - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 April 2025.
- Where is Hazelrigg Lane, Scotforth - Solar Farm?
- On the edge of Lancaster, Lancashire, United Kingdom (postcode LA1).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).